The Challenge

Clear Channel are a leading marketing, and outdoor media specialist with nationwide coverage. Cushman & Wakefield were instructed to find a solution to improve the quality of Clear Channel’s office space whilst maintaining their location in Golden Square. Having reviewed numerous alternate locations, the optimum solution was to maintain their current building and deliver a Category A & B fit out to client requirements. The works had to be completed within a challenging timeframe to ensure minimal cost and disruption to the client.

Clear Channel fit out


The Solution

Working closely with our Agency team, following a property search at numerous locations, it was determined that the best solution for the improvement of Clear Channel’s office space was to negotiate a financial contribution with the existing landlord. A contribution was secured and C&W designed, costed and delivered a 20,000 sq ft Category A & B fit out and temporarily relocated Clear Channel to minimise disruption to their business at minimum cost.

Cushman & Wakefield Interior Design worked closely with Clear Channel to create a space that provided a more collaborative and agile working environment. They wanted to improve the visibility of their products and branding throughout the building whilst at the same time producing a more technologically enabled environment to allow for future flex and growth.

In order to achieve Clear Channel’s programme aspirations, C&W split the works into a strip out phase and fit out phase. The fit out works were procured on a two stage traditional basis to expedite programme and provide maximum time for design decisions.

Clear Channel


The Results

Cushman & Wakefield provided full turnkey services including project management, interior design, and cost consultancy to deliver this Category A & B fit out on a fast track basis.

Achieved within a tight programme, Clear Channel were in occupation as planned in August 2016. A high quality, collaborative working space has been delivered and the client has been impressed with the quality of the new working environment.